Tenant Handbook

Housekeeping

  • All common areas shall be kept clean at all times.  These areas include but are not limited to common corridors, restrooms, stairwells, lobbies, elevators, loading dock, and the grounds. Lobby areas are to be vacuumed at end of each work shift.
  • Construction debris and trash shall be removed from the jobsite as soon as practicable.  Management reserves the right to require trash removal on demand.
  • Construction debris and trash shall not be stored for any period of time in mechanical rooms, freight lobbies, adjacent spaces or any other location outside of the jobsite. Contractors must furnish sealed trash cans to be used for food-related trash to prevent insect and rodent infestation.
  • All trash removal shall be scheduled for weekends, or Monday through Friday between the hours of 6:00 p.m. and 7:00 a.m.
  • Contractor shall provide walk off mats at each exit from the jobsite.  Mats shall be maintained or replaced as necessary to prevent construction dust from being tracked throughout the buildings. 
  • Mechanical and Electrical rooms shall be broom cleaned daily.  Panel covers shall be replaced on all active electrical panels daily.
  • Cleaning of paint brushes, spackle knives, tools and buckets are permitted only in the slop sink in the janitor’s closet.
  • No contractor is permitted to use the building’s equipment, ladders or tools.