Tenant Handbook

Materials

  • Materials shall be hoisted via the elevators.  Passenger elevators shall not be used for material transportation.
  • No materials shall be hoisted outside the elevator cabs without prior notification and approval of Management.  All costs associated with material hoisting shall be borne by the Contractor.
  • Materials shall not be stored in the elevator lobbies, mechanical rooms or any other common space within the building.  Materials shall not be stored in adjacent vacant space without prior consent of management.
  • Dollies, carts and other moving or loading apparatus shall have rubber tires.  The expense of any damage caused to floors/wall, etc., by moving materials shall be borne by the Contractor causing the damage.  All public areas are to be sufficiently protected in advance by the Contractor to avoid such damage.
  • Freight elevators are available on a first come, first serve basis.  The Contractor is advised to contact Management 24 hrs. in advance of any hoisting operations that will require extensive use of the freight elevators to determine the availability of the elevators.  (See 1.2 Freight Elevators).
  • Management reserves the right to inspect all tool boxes, storage bins, trash bins, or other conveyances prior to removal from the property.
  • The Contractor shall comply with all Federal, State, and Local regulations pertaining to the use of hazardous materials or potentially hazardous materials.  No hazardous materials may be used on the property without prior written approval of Management. All MSDS sheets must be submitted to Management prior to delivery of material to site.
  • All doors, hardware, door frames, light fixtures, HVAC units, air boots, slot diffuses, millwork and appliances to be removed from demolished leases are the property of the building and may be required to be relocated elsewhere in the building.  Please contact the Construction Management office for direction.